Guide
The maintenance that actually matters
A roof that gets looked at twice a year lasts appreciably longer than one that gets looked at when it leaks. The work involved is small.
Get it looked at
Three questions, and up to three Fountain Valley contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in Fountain Valley and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Look in the attic after heavy weather
The attic shows a leak long before the ceiling does. After any serious storm, take a torch up and look at the underside of the deck around penetrations and valleys.
Cut back anything touching the roof
Branches abrade the surface in wind and drop debris that holds moisture. Keep growth well clear of the covering, and clear of the gutters while you are at it.
Deal with growth properly
Cleaning a roof aggressively does more damage than the growth was doing. Gentle treatment, patience, and a strip at the ridge to stop it returning.
Clear the gutters before the wet season
Blocked gutters back water up under the bottom course of shingles and rot the fascia behind them. This is the highest-value hour of maintenance there is, and here it wants doing before November through March.
Keep the penetrations honest
Pipe boots crack, sealant shrinks, and satellite mounts get screwed straight through the covering. Every penetration is a hole somebody decided to make watertight, and each is worth a look.
Twice a year, from the ground
You do not need to be on the roof to find most problems. A slow lap of the house at a low angle finds nearly all of them.
In short
Put two dates in the calendar, one either side of November through March. That is the whole programme.
Related questions
How quickly will someone call?
Most requests are picked up the same day, often within an hour. Emergencies are prioritised. If you have not heard anything by the next morning, check voicemail — contractors usually call from a mobile.
What warranty should I expect?
Ask for both in writing: the material warranty from the manufacturer and the workmanship warranty from the contractor. The second one is the one that matters in year three, and it is only as good as the company behind it.
Can I just put a new roof over the old one?
Codes in most places allow two layers. That does not make it wise. You lose the chance to see the deck, and the next roofer has twice as much to remove.